
Karupar Sai Residency
2 & 3 BHK Apartments in Karaikudi
Nine homes on a quiet street, in central Karaikudi.
Nine apartments on North Seniyar Street, in the heart of Karaikudi — three floors over stilt parking, with 2 BHK and 3 BHK options across north, east and south facings, designed by TSO Design.
Under Construction
3
Floors
9
Homes
1,151 – 1,226
SQFT
₹78.83 L*
Onwards
Available Configurations
2 BHK
1,151 sq.ft · North-facing
3 BHK
1,226 sq.ft · East-facing
3 BHK
1,184 sq.ft · South-facing
Living at Karupar Sai Residency
Well-proportioned rooms, good natural light, and a layout that feels immediately intuitive.

Front Elevation

Living Room — Indicative

Bedroom — Indicative
Interior images are illustrative only. Interior fit-out is in the buyer's scope and is not part of the project handover.
Amenities
One covered car park per apartment
V3F automatic 6-passenger lift
24/7 CCTV surveillance
Video intercom with relay door
Access-controlled main entrance
Three-phase EB supply
Generator backup for common areas
Borewell + corporation water source
Common toilet for drivers & staff
Specifications
Your Neighbourhood
Set in the older core of Karaikudi — close to major temples, transport hubs and key civic amenities. A few of the landmarks within easy reach are listed below.
Nagara Sivan Kovil
0.5 km
Koppudai Amman Kovil
0.8 km
Karaikudi Bus Stand
1 km
KMC Hospital, Karaikudi
1.2 km
Karaikudi Junction Railway Station
1.2 km
Janapriya Hypermarket
2 km
Alagappa University
3 km
Frequently Asked Questions
Karupar Sai Residency is on North Seniyar Street, in the heart of Karaikudi, Tamil Nadu.
The development offers 2 BHK and 3 BHK apartments, with north, east and south facing options.
Homes range from approximately 1,150 to 1,230 sq. ft. of built-up area.
It is a boutique development of nine homes across three floors over stilt parking.
Yes. The building is designed over a stilt parking level for residents.
Karupar Sai Residency is designed by TSO Design.
The project is currently under construction, with possession targeted for April – May 2027. Please contact our team for the latest update.
Reach out through our enquiry form or by phone, and a member of our team will be in touch to share details and arrange a visit at your convenience.
Why Choose Us?
Selective by Principle
Being selective about what we build means every project receives our direct oversight and full attention — from the first brick to the final handover
Built on Integrity
Our reputation is built on complete transparency — at every stage, you will know precisely where your investment stands and what comes next
Quality That Compounds
We hold ourselves to an exacting standard on both construction quality and site selection — because a home built well, in the right location, keeps rewarding you long after you move in
Construction Status
As of April 2026
Targeted handover · April – May 2027
Stage of Construction
Status
Foundation
Plinth & Stilt Columns
Roof Slab
Block Work
Plastering
Flooring
Painting
Common Area Works
External Finish Works
Ready for Handover


