Karupar Sai Residency — architect's perspective of the front elevation

Karupar Sai Residency

2 & 3 BHK Apartments in Karaikudi

Nine homes on a quiet street, in central Karaikudi.

Nine apartments on North Seniyar Street, in the heart of Karaikudi — three floors over stilt parking, with 2 BHK and 3 BHK options across north, east and south facings, designed by TSO Design.

Under Construction

3

Floors

9

Homes

1,151 – 1,226

SQFT

₹6,500

Per Sq Ft

Available Configurations

2 BHK

1,151 sq.ft · North-facing

2/3

3 BHK

1,226 sq.ft · East-facing

3/3

3 BHK

1,184 sq.ft · South-facing

2/3

Living at Karupar Sai Residency

Well-proportioned rooms, good natural light, and a layout that feels immediately intuitive.

Front Elevation

Front Elevation

Living Room — Indicative

Living Room — Indicative

Bedroom — Indicative

Bedroom — Indicative

Interior images are illustrative only. Interior fit-out is in the buyer’s scope and is not part of the project handover.

Amenities

  • One covered car park per apartment

  • V3F automatic 6-passenger lift

  • 24/7 CCTV surveillance

  • Video intercom with relay door

  • Access-controlled main entrance

  • Three-phase EB supply

  • Generator backup for common areas

  • Borewell + corporation water source

  • Common toilet for drivers & staff

Specifications

Your Neighbourhood

Set in the older core of Karaikudi — close to major temples, transport hubs and key civic amenities. A few of the landmarks within easy reach are listed below.

  • Nagara Sivan Kovil

    0.5 km

  • Koppudai Amman Kovil

    0.8 km

  • Karaikudi Bus Stand

    1 km

  • KMC Hospital, Karaikudi

    1.2 km

  • Karaikudi Junction Railway Station

    1.2 km

  • Janapriya Hypermarket

    2 km

  • Alagappa University

    3 km

Brochure & Floor Plans

Why Choose Us?

Selective by Principle

Being selective about what we build means every project receives our direct oversight and full attention — from the first brick to the final handover

Built on Integrity

Our reputation is built on complete transparency — at every stage, you will know precisely where your investment stands and what comes next

Quality That Compounds

We hold ourselves to an exacting standard on both construction quality and site selection — because a home built well, in the right location, keeps rewarding you long after you move in

Construction Status

As of September 2026

Targeted handover · April – May 2027

  1. Foundation

  2. Plinth & Stilt Columns

  3. First, Second & Third Floor Slabs

  4. Roof Slab

  5. Brickwork — First Floor

  6. Brickwork — Second & Third Floors

  7. Plastering

  8. Flooring

  9. Painting

  10. Common Area Works

  11. External Finish Works

  12. Ready for Handover

Site Photos

Site visit · September 2026